Skip to the content
FREE BETA 100 days free, up to 10 homes a month
Remodel

Panel schedule template

A panel schedule lists every circuit with its breaker and what it feeds. Copy the blank one below, or draw your plan, put outlets and lights on circuits, and get the schedule filled in, with points, rooms and cable length.

  • Filled in from your plan
  • One-line diagram
  • Cable length per circuit

Drawing is free. A clean export costs $5 per home after the beta, or Pro from $19 a month.

By the Squaremetry team · Updated · Sources

30′ 6″27′ 2″LIVING ROOM285.1 sq ftKITCHEN187.7 sq ftBATH104.2 sq ftBEDROOM110.6 sq ftHALL60.2 sq ft
Floor plan of a house with lights, switches and outlets, the panel in the hall and the cable runs per circuit from the panel.

A blank panel schedule

Most residential panels number the breakers odd on the left and even on the right. Write what each breaker feeds in plain words, like "Kitchen counter, left of the sink", not "Kitchen".

Blank panel schedule

Copy it, or let the editor fill it in

Blank panel schedule
No.FeedsAmpsNo.FeedsAmps
12
34
56
78
910
1112
1314
1516

The same schedule, filled in from a plan

This small house has 8 circuits and 20 points. Points are lights, outlets and appliance connections; switches do not count as points. The cable length comes from Lay all cables: 505′ 1″ in all.

Panel schedule

From the editor; the PDF also lists the kind and the rooms

Panel schedule
No.CircuitBreakerPolesRCDPointsCable
1Lighting15 A1none6150′ 6″
2Living room15 A1none493′ 2″
3Bedroom and hall15 A1none487′ 10″
4Kitchen counter 120 A11133′ 10″
5Range40 A2none142′ 10″
6Washer20 A11112′ 10″
7Kitchen counter 220 A11259′ 2″
8Bath20 A11124′ 10″

What labels are required on an electrical panel?

The National Electrical Code asks that every circuit is identified as to its clear, evident and specific purpose, on a directory on the face or inside of the panel door (NEC 408.4). A state inspection checklist says it the same way; your inspector applies the edition your area adopted.

The editor writes down what you drew: the name you gave each circuit and the rooms where its points are. It does not check a circuit against the code.

Drawing aid

Drawing aid, not an installation design. A licensed electrician or plumber designs, connects and inspects the work.

The one-line diagram

The single-line diagram shows the main switch, each RCD with its circuits (the editor's word for a ground-fault breaker group), and the circuits without one, with the breaker and the number of points. A 240 V range shows two poles.

Main switch 125 A · Single phaseRCD 120 A4Kitchencounter 11 point20 A6Washer1 point20 A7Kitchencounter 22 points20 A8Bath1 pointRCD: None15 A1Lighting6 points15 A2Living room4 points15 A3Bedroom andhall4 points40 A5Range1 pointDrawing aid, not an installation design.
Single-line diagram from the editor: a 125 A main switch, one RCD with four circuits and four circuits without.

Spaces in the panel

The editor counts spaces: 8 breakers take 9 spaces, because a 240 V circuit like the range takes two.

How it works in the editor

  1. Draw your home, or type a list of rooms. Then turn on Systems.
  2. Under Symbols, place lights, switches, outlets and a meter cupboard (your panel). An outlet or switch lands against the wall at its usual height.
  3. Under Fuse box, set the main switch and the supply, and click Add circuit. Name the circuit, pick the breaker, the RCD and what it is for, then click Put symbols on this circuit.
  4. Click Lay all cables: each point gets a run from the panel or the point before it, with its length.
  5. Under Fuse box, click Panel schedule as PDF. You get the schedule and a single-line diagram, and every sheet says it is a drawing aid.

Sources

Questions

Questions

About panel schedules. Can’t find your answer? Send us a message.

What is a panel schedule?

A list of every circuit in the electrical panel with its breaker and what it feeds. It hangs on or inside the panel door, so anyone can find the right breaker.

What labels are required on electrical panels?

The NEC asks that every circuit is identified by its clear, evident and specific purpose on a directory at the panel (408.4). Your inspector decides what is enough for your area.

What is the best way to label an electrical panel?

Name each breaker by what it feeds and where, in words that do not depend on who lives there: "Bedroom 2, outlets", not "Emma's room". Number them as on the panel and keep the list at the panel.

Is there a panel schedule template I can fill in?

Yes: copy the blank one on this page, or draw your home in Squaremetry and get it filled in with circuits, points, rooms and cable length. Drawing is free; a clean PDF costs as any export.

Does this check my panel against the code?

No. Squaremetry draws and counts. A licensed electrician designs the installation, connects it and gets it inspected.

Start with your first floor plan

The beta is free for 100 days, with up to 10 homes a month. After the beta: $5 per home, or Pro from $19 a month.

Join the free beta

or sign in with a code by email